Find the right contracts, get tender alerts instantly, and submit your bids — all in one place. Access now →

CQC Inspection 2026/27: The New Framework and Using Your Rating in Tenders

CQC is moving to sector-specific frameworks with key lines of enquiry and no scoring, but nothing has switched over yet. Here is what a CQC inspection looks like now, how ratings work, and how to use your rating and report to win tenders.

On this page

Share

Bidding for a supported living contract?

Let’s identify three high-potential tenders in one hour.

Your next CQC inspection will happen in a year of change. The Care Quality Commission is replacing its Single Assessment Framework with four sector-specific frameworks, bringing back key lines of enquiry and dropping numerical scores. But in November 2026, the new approach is still being tested, and providers are still assessed under the current rules.

That gap between “announced” and “in force” is causing confusion, and much of the guidance online is out of date.

This guide sets out what is confirmed about the CQC inspection process today, using CQC’s own publications. It explains how an inspection works now, how ratings are reached and how to prepare. It then covers the part most guides skip: how to use your rating and inspection evidence to win council and NHS contracts.

What is changing in CQC inspections for 2026/27?

The short answer: CQC plans to move to four sector-specific assessment frameworks, but none is in force yet. Until CQC confirms a go-live date, every CQC inspection still uses the current assessment framework and its 34 quality statements.

Here is the timeline, taken from CQC’s own pages:

  • Late 2025: CQC consulted on “Better regulation, better care”. The consultation closed on 11 December 2025 and received 1,703 responses.
  • March 2026: CQC published its initial response and four draft frameworks, for adult social care, mental health care, primary care and community services, and hospitals.
  • 12 June 2026: feedback on the draft frameworks closed.
  • June to October 2026: CQC ran voluntary pilots of the new assessment method alongside normal inspections, with final evaluation planned for November 2026. Pilot judgements have no legal standing and do not affect ratings.
  • 27 August 2026: CQC’s latest improvement update said testing had continued over the summer, with more sector-specific engagement planned for the autumn. It gave no go-live date.

CQC’s initial response to the Better regulation, better care consultation sets out five changes it intends to make.

The current framework compared with the proposed frameworks

Feature Current framework (in force now) Proposed sector frameworks (draft)
Number of frameworks One framework for all sectors Four: adult social care, mental health, primary care and community services, hospitals
What inspectors assess against 34 quality statements (“we statements”) Key lines of enquiry (24 in the adult social care draft)
How judgements are made Each quality statement is scored 1 to 4 and scores build up to ratings No scoring. Professional judgement guided by rating characteristics
Rating characteristics Not used Reintroduced, describing what Outstanding, Good, Requires Improvement and Inadequate look like
Level of judgement Quality statement scores, then key question ratings Ratings made directly at key question level
Five key questions and four ratings Yes Yes, unchanged

The draft numbers may still change. CQC has said it will publish a full consultation response during 2026. At the time of writing, we could not find that response or a confirmed implementation date on CQC’s website.

What happens during a CQC inspection now?

A CQC inspection today is an assessment that combines on-site and off-site evidence, and its timing is driven by risk. CQC no longer works to a fixed inspection cycle. Your next CQC inspection will be either planned or responsive, where CQC has received concerning information.

How CQC decides when to inspect

In May 2026, CQC set out its priorities for clearing aged ratings and services that have never been assessed. For adult social care, these include:

  • services with urgent, emerging risks
  • services not assessed since registration where CQC’s data suggests very high risk
  • services registered for over a year that have not yet been assessed
  • services with a rating over six years old.

CQC also described a more proportionate approach for adult social care services rated Good in all five key questions, with a registered manager, a rating over six years old, no significant risk in its data and no ongoing enforcement. These assessments focus on people’s experiences and outcomes, observation and a targeted review of records.

On-site and off-site evidence

During a CQC inspection, inspectors gather evidence under six evidence categories. On site, inspectors observe care and the environment and talk with people, staff and leaders. CQC may visit without notice, especially in response to a concern. Off site, it reviews information it already holds, such as statutory notifications, feedback from the public, national data like the Capacity Tracker, and evidence it requests from you, usually by email.

Adult social care providers must still complete the annual Provider Information Return. Outside that, CQC’s guidance says you do not need to submit evidence proactively. It will ask for what it needs.

After a CQC inspection, you receive a draft report and a chance to challenge factual accuracy before publication.

CQC inspection: inspector reviewing records and medicines storage with a tablet

How do CQC ratings work?

CQC rates each of the five key questions (safe, effective, caring, responsive and well-led) as Outstanding, Good, Requires Improvement or Inadequate. For adult social care, those five ratings are then combined into an overall rating.

Under the current framework, inspectors score each quality statement they assess from 1 (significant shortfalls) to 4 (exceptional standard). The scores become a percentage for each key question:

  • 25 to 38% = Inadequate
  • 39 to 62% = Requires Improvement
  • 63 to 87% = Good
  • 88% and above = Outstanding

Two safeguards stop weak areas being hidden. A key question in the Good range is limited to Requires Improvement if any quality statement scores 1. An Outstanding-range score is limited to Good if any statement scores 1 or 2.

For the overall rating in adult social care, CQC normally applies these principles:

  • Outstanding: at least two key questions Outstanding and the rest Good
  • Good: no key question Inadequate and no more than one Requires Improvement
  • Requires Improvement: two or more key questions Requires Improvement
  • Inadequate: two or more key questions Inadequate.

The four rating levels and the five key questions will stay under the new frameworks. What changes is how inspectors reach them: holistic judgement against rating characteristics instead of percentage scores.

How should you prepare for a CQC inspection in 2026/27?

Prepare for your CQC inspection against the current framework, while making sure your evidence would also stand up to the new key lines of enquiry. Good evidence is the same under both. Only the headings change.

Keep working to the current guidance

CQC’s May 2026 update was clear: until it implements the new approach, providers should keep referring to the current guidance on how it assesses quality and performance. Do not rewrite your whole governance system around a draft framework that may still change.

Read the draft framework for your sector

The adult social care draft is useful even before it goes live. Its key lines of enquiry cover areas such as safety culture, safe staffing, consent, person-centred care, equitable access and governance. The rating characteristics show what CQC expects at each level. Use them to test your audits and spot gaps.

Build an evidence file you can produce on the day

A strong CQC inspection rarely depends on documents created the week before. Inspectors look for evidence that systems work over time:

  • audits that are dated, signed and show actions closed
  • incident and safeguarding logs with learning recorded and shared
  • infection control and outbreak records, such as the steps in our flu season 2026 guide for care providers
  • care plans that reflect what people tell you matters to them
  • supervision, training and competency records that match your rota
  • feedback from people, families and staff, and what you changed as a result
  • your current action plan, with owners and dates.

How do commissioners use your CQC inspection results in tenders?

Most councils and NHS commissioners use your CQC registration as a pass/fail check and your CQC rating as a quality threshold or contract condition. Your latest CQC inspection report is often the first thing an evaluator opens.

The table below shows the patterns we see most often in health and social care procurements. Always check the specific tender documents, because thresholds vary between buyers.

Your rating What commissioners typically expect What to put in your bid
Outstanding Usually eligible for all lots. Evaluators still score the written answers, not the rating Specific practice behind the rating, with outcomes and quotes from the report
Good Meets most minimum thresholds Evidence for each key question, plus any areas the report flagged and how you have addressed them
Requires Improvement May be excluded where a “Good or better” floor applies. Elsewhere, often eligible but with closer scrutiny or contract conditions A clear improvement plan, progress since inspection and independent evidence of change
Inadequate Commonly excluded, or placements suspended under existing contracts Usually not the time to bid. Focus on improvement, and seek advice before declaring
Not yet rated Accepted by some buyers, especially for new frameworks and dynamic purchasing systems Registration evidence, governance systems, leadership experience and mock-inspection or audit results

For a deeper look at writing each rating into method statements, read our guide to translating your CQC rating into a winning tender response.

Don’t forget local quality monitoring

Many councils also run their own quality checks on the services they fund. Some use PAMMS (Provider Assessment and Market Management Solution), a quality-assurance tool built around CQC standards. Commissioners may weigh a recent PAMMS assessment alongside, or ahead of, an older CQC rating. Our article on PAMMS ratings and contract success explains how it works.

If a tender closes soon and your rating or PAMMS result needs careful handling, book a free consultation with our team. We can help you decide how to present it before you submit.

How can you use a CQC inspection report as tender evidence?

Treat your CQC inspection report as a source of evidence, not just a rating to quote. Evaluators score what you show them, and the report is independent proof.

Quote findings, not just the rating

“We are rated Good” is a line every bidder writes. A short, referenced quote from your report about safe staffing, person-centred care or leadership is stronger. Match each quote to the question being asked, and give the report date.

Map evidence to the key questions

Tender quality questions often follow the same themes as the five key questions: safety, outcomes, dignity, responsiveness and governance. Organise your CQC inspection evidence under those headings now. When the new frameworks arrive, you can add the matching key lines of enquiry without starting again.

Address an old rating head on

CQC itself has said that some ratings may not reflect current performance. If your last CQC inspection was years ago, say so plainly in your bid. Then show current evidence: recent audits, PAMMS or council monitoring results, complaints and compliments data, and staff retention figures.

What if your CQC inspection rated you Requires Improvement?

A Requires Improvement rating does not automatically end your tendering plans, but it changes what you need to prove. Commissioners want confidence that the issues are understood, fixed and unlikely to return.

  1. Check eligibility first. Read the selection questionnaire and specification for any minimum rating. If the tender requires Good or better, do not spend days on a bid that will fail at the first gate.
  2. Be open. Name the key questions rated Requires Improvement. Hiding them damages trust, because evaluators can read the report.
  3. Show the improvement plan. Set out each finding, the action taken, who owns it and when it was completed.
  4. Prove progress. Use evidence from after the inspection: re-audits, council monitoring visits, PAMMS results, training completion and feedback from people using the service.
  5. Show leadership grip. Explain how your governance now spots problems early. This links directly to the well-led key question.

Frequently asked questions

Has CQC’s new assessment framework started?

Not as of mid-November 2026. CQC published four draft sector frameworks in March 2026 and piloted them between June and October 2026. CQC says providers should follow its current guidance until it implements the new approach. We have not found a confirmed go-live date.

Are key lines of enquiry (KLOEs) coming back?

Yes, in a new form. The draft frameworks replace quality statements with key lines of enquiry. The adult social care draft has 24, spread across the five key questions. These are drafts and may change before launch.

How often does CQC inspect care services?

There is no fixed frequency for a CQC inspection. CQC uses risk and the information it holds to decide when to assess. Its 2026 priorities target urgent risks, services never assessed, and adult social care ratings more than six years old.

Will my existing CQC rating change when the new framework starts?

CQC has not said that existing ratings will be recalculated. Ratings normally change after a new assessment. The rating on your CQC profile remains your published rating until then.

Can I bid for council contracts with a Requires Improvement rating?

Often, yes, but it depends on the tender. Some frameworks set a “Good or better” minimum. Others accept Requires Improvement but expect a clear improvement plan and evidence of progress.

Conclusion

The CQC inspection landscape for 2026/27 is in transition. Sector-specific frameworks, key lines of enquiry and rating characteristics are coming, and scoring is going. But until CQC confirms the switch, every CQC inspection runs under the current framework. Prepare for that, and use the drafts to check your evidence.

For tendering, the message is simple. Your rating opens or closes the door, and your inspection evidence wins the marks. Quote your report, map it to the key questions, deal openly with any weaker areas and back it with current monitoring results. Providers bidding for care home tenders and other council contracts who do this stand out from bidders who only quote a rating.

If you want your next bid to make the most of your CQC rating, get help with your tender from AssuredBID.

Leave a Reply

Your email address will not be published. Required fields are marked *